Search results for 'hand sanitiser 60ml pack '

Maximum Search query length is 25. Your query was cut.

Relevance
Set Ascending Direction

Grid List

10 per page

Items 131 to 140 of 157 total

  1. SPLIT / B TYPE TROLLEY, INSULATED STEL, LUL / TFL SPECIFICATION, COMPLETE WITH BRAKE HANDLE & PUSH BAR, 2 X REDLED Split Trolley LU Specific - B Type

    SPLIT / B TYPE TROLLEY, INSULATED STEL, LUL / TFL SPECIFICATION, COMPLETE WITH BRAKE HANDLE & PUSH BAR, 2 X REDLED

    PLEASE CALL FOR PRICE, AVAILABILITY AND LEAD TIME - 0114 383 0110

    Designed to be used as a manual propelled, stand-alone load-bearing rolling platform for use on the rail track. Each trolley is equipped with a fail safe braking system and is supplied with detachable Brake and Push Handles. The Split Trolley has been designed to be split into two halves to aid with manual handling and transporting to and from site.

  2. LINK TROLLEY, STEL, NETWORK RAIL SPECIFICATION, NON INSULATED WHEELS & WOODEN DECK COMPLETE WITH BRAKE HANDLE, PUSH BAR & REDLEDS LINK TROLLEY, STEL, NETWORK RAIL SPECIFICATION, NON INSULATED WHEELS & WOODEN DECK COMPLETE WITH BRAKE HANDLE, PUSH BAR & REDLEDS

    LINK TROLLEY, STEL, NETWORK RAIL SPECIFICATION, NON INSULATED WHEELS & WOODEN DECK COMPLETE WITH BRAKE HANDLE, PUSH BAR & REDLEDS

    The Link Trolley supplied by STEL is used on the Network Rail (NWR) and London Underground (LUL) infrastructure. The Link Trolley is used for carrying heavy loads of tools and equipment accross the rail tracks to accomodate track maintenance operations.

    PLEASE CALL FOR PRICE, AVAILABILITY AND LEAD TIME - 0114 383 0110

  3. LINK TROLLEY, STEL, LUL SPECIFICATION, INSULATED WHEELS & ALUMINIUM DECK COMPLETE WITH BRAKE HANDLE, PUSH BAR & REDLEDS LINK TROLLEY, STEL, LUL SPECIFICATION, INSULATED WHEELS & ALUMINIUM DECK COMPLETE WITH BRAKE HANDLE, PUSH BAR & REDLEDS

    LINK TROLLEY, STEL, LUL SPECIFICATION, INSULATED WHEELS & ALUMINIUM DECK COMPLETE WITH BRAKE HANDLE, PUSH BAR & REDLEDS

    PLEASE CALL FOR PRICE, AVAILABILITY AND LEAD TIME - 0114 383 0110

    Designed to be used as a manual propelled, stand-alone load-bearing rolling platform for use on the rail track. Each Link Trolley is equipped with a fail safe braking system and is supplied with detachable Brake and Push Handles. Up to three Link Trolleys can be connected together.

  4. 15" Fishplate Nut Running Spanner

    15" Fishplate Nut Running Spanner

    £19.95
    15" Fishplate Nut Running Spanner, used for the quick release of fish plate nuts. The length of the handle allows the railway worker to quickly remove or tighten the nuts.
  5. Hickory Handle Keying Hammer - 10LB Hickory Handle Keying Hammer - 10LB

    Hickory Handle Keying Hammer - 10LB

    £32.38
    • Keying Hammer Head - 10lb / 4.5kg
    • Hickory Handle
    • Overall Length - Approximately 91.5cm
  6. Hickory Handle Sledge Hammer - 7LB

    Hickory Handle Sledge Hammer - 7LB

    £19.95
    • Sledge Hammer Head - 7lb / 3.2kg
    • Hickory Handle
    • Overall Length - Approximately 75cm
  7. Hickory Handle Sledge Hammer - 10LB

    Hickory Handle Sledge Hammer - 10LB

    £30.95
    • Sledge Hammer Head - 10lb / 4.5kg
    • Hickory Handle
    • Overall Length - Approximately 75cm
  8. Insulated Fibreglass 9 Prong Fork Insulated Fibreglass 9 Prong Fork

    Insulated Fibreglass 9 Prong Fork

    £75.00
    • Conforms to BS8020
    • Certified to 1000 Volts - Tested to 10000 Volts
    • Solid forged from one piece of steel
    • YD handle
    • Strong yet lightweight fibreglass shaft has excellent insulating properties
  9. Insulated Contractors 4 Prong Fork - BS8020:2011 Insulated Contractors 4 Prong Fork - BS8020:2011

    Insulated Contractors 4 Prong Fork - BS8020:2011

    £35.48
    • Conforms to BS8020
    • Certified to 1000 Volts - Tested to 10000 Volts
    • Solid forged from one piece of steel
    • YD handle
    • Strong yet lightweight fibreglass shaft has excellent insulating properties
    • Lightweight at just 2.5kg
    • BS8020:2011
  10. PANDROL TYPE SLEEPER LIFTER, SUITABLE FOR FC & FE, STEL FastClip Sleeper Lifter

    PANDROL TYPE SLEEPER LIFTER, SUITABLE FOR FC & FE, STEL

    £175.00
    Cat No Reference: 0039/47852 Suitable for use on FASTCLIP FC and FASTCLIP FE The original version of the sleeper lifter can still be used in conjunction the new installer where sleepers need to be lifted more than 20mm. Instructions for Sleeper Lifter LP12608 The scissor action of the frame opens in order to locate the pincers of the tool into the sides of the shoulder with the clip in the ‘Parked’ position. Place the hook of the tool over the head of the rail, and as the body of the tool rises the scissor action closes the pincers and lock into the shoulder. Once located grasp both handles of the ‘Tee’ bar, and stand ‘naturally’ with feet apart then move one leg half a pace back, to prevent loss of balance during sleeper lifting. Push the handle away to lift any ‘dropped’ sleeper if ballast conditions do not support the sleepers engaging with the foot of the rail. These tools should be used in pairs to lift the sleeper to locate both rails simultaneously with the rail seats of the sleeper. The sleeper lifter can used on the same rail seat as the FASTCLIP installer, by locating between the hooks of the installation tool.
Relevance
Set Ascending Direction

Grid List

10 per page

Items 131 to 140 of 157 total