Search results for 'rail handler ironman nwr '

Maximum Search query length is 25. Your query was cut.

Relevance
Set Descending Direction

Grid List

10 per page

Items 11 to 20 of 114 total

  1. 1
  2. 2
  3. 3
  4. 4
  5. 5
  1. Steel Sleeper Tongs

    Steel Sleeper Tongs

    £87.49
    • Tongs used for the safe manual handling and moving of Steel Sleepers.
    • Built to be both durable and robust, they allow the rail worker to use them to re-position and remove steel sleepers as required.
  2. Insulated Steel Sleeper Tongs

    Insulated Steel Sleeper Tongs

    £154.95
    • Tongs used for the safe manual handling and moving of Steel Sleepers.
    • Built to be both durable and robust, they allow the rail worker to use them to re-position and remove steel sleepers as required.
    • Insulated to BS8020.
  3. PANDROL TYPE SLEEPER LIFTER, SUITABLE FOR FC & FE, STEL FastClip Sleeper Lifter

    PANDROL TYPE SLEEPER LIFTER, SUITABLE FOR FC & FE, STEL

    £175.00
    Cat No Reference: 0039/47852 Suitable for use on FASTCLIP FC and FASTCLIP FE The original version of the sleeper lifter can still be used in conjunction the new installer where sleepers need to be lifted more than 20mm. Instructions for Sleeper Lifter LP12608 The scissor action of the frame opens in order to locate the pincers of the tool into the sides of the shoulder with the clip in the ‘Parked’ position. Place the hook of the tool over the head of the rail, and as the body of the tool rises the scissor action closes the pincers and lock into the shoulder. Once located grasp both handles of the ‘Tee’ bar, and stand ‘naturally’ with feet apart then move one leg half a pace back, to prevent loss of balance during sleeper lifting. Push the handle away to lift any ‘dropped’ sleeper if ballast conditions do not support the sleepers engaging with the foot of the rail. These tools should be used in pairs to lift the sleeper to locate both rails simultaneously with the rail seats of the sleeper. The sleeper lifter can used on the same rail seat as the FASTCLIP installer, by locating between the hooks of the installation tool.
  4. PANDROL TYPE PAN SETTER, STEL, ALL BLUE SUITABLE FOR ALL NWR SLEEPERS FITTED WITH PR, E & E PLUS PR, E, E-Plus & RE Clips Pan Setter

    PANDROL TYPE PAN SETTER, STEL, ALL BLUE SUITABLE FOR ALL NWR SLEEPERS FITTED WITH PR, E & E PLUS

    £137.50
    Cat No; Reference: 0039/42900 The PANSETTER is suitable for all Network Rail Sleepers fitted with PR, e & e-PLUS. Used for lifting the sleeper to the rail foot. It pushes the rail over, leaving the correct gap between the rail foot and the Pandrol housing, so that the insulator can be easily placed in the correct position. All Pandrol hand-tools can be supplied with optional insulated handles, which have recently been upgraded to 35mm diameter cylindrical handles with ‘T’ cross bars for improved ergonomic and safer use.
  5. Small Pad Scraper Small Pad Scraper

    Small Pad Scraper

    £25.62
    Designed for use to facilitate the removal of old insulating pads from rail and sleepers.
  6. Large Pad Scraper Large Pad Scraper

    Large Pad Scraper

    £28.26
    Designed for use to facilitate the removal of old insulating pads from rail and sleepers.
  7. Insulated Keying Hammer - 10lb Insulated Keying Hammer - 10lb

    Insulated Keying Hammer - 10lb

    £95.99
    • Conforms to BS8020 : 2011
    • Keying Hammer Head - 10lb / 4.5kg
    • Fiberglass Shaft
    • Rubber Grip Handle
    • Steel Protective Collar
    • Overall Length - Approximately 92.5cm
  8. LINK TROLLEY, STEL, LUL SPECIFICATION, INSULATED WHEELS & ALUMINIUM DECK COMPLETE WITH BRAKE HANDLE, PUSH BAR & REDLEDS LINK TROLLEY, STEL, LUL SPECIFICATION, INSULATED WHEELS & ALUMINIUM DECK COMPLETE WITH BRAKE HANDLE, PUSH BAR & REDLEDS

    LINK TROLLEY, STEL, LUL SPECIFICATION, INSULATED WHEELS & ALUMINIUM DECK COMPLETE WITH BRAKE HANDLE, PUSH BAR & REDLEDS

    PLEASE CALL FOR PRICE, AVAILABILITY AND LEAD TIME - 0114 383 0110

    Designed to be used as a manual propelled, stand-alone load-bearing rolling platform for use on the rail track. Each Link Trolley is equipped with a fail safe braking system and is supplied with detachable Brake and Push Handles. Up to three Link Trolleys can be connected together.

  9. SPLIT / B TYPE TROLLEY, INSULATED STEL, LUL / TFL SPECIFICATION, COMPLETE WITH BRAKE HANDLE & PUSH BAR, 2 X REDLED Split Trolley LU Specific - B Type

    SPLIT / B TYPE TROLLEY, INSULATED STEL, LUL / TFL SPECIFICATION, COMPLETE WITH BRAKE HANDLE & PUSH BAR, 2 X REDLED

    PLEASE CALL FOR PRICE, AVAILABILITY AND LEAD TIME - 0114 383 0110

    Designed to be used as a manual propelled, stand-alone load-bearing rolling platform for use on the rail track. Each trolley is equipped with a fail safe braking system and is supplied with detachable Brake and Push Handles. The Split Trolley has been designed to be split into two halves to aid with manual handling and transporting to and from site.

  10. SKATE BASKET, STANDARD, NYLON WHEELS C/W 2 X HANDLES SKATE BASKET, STANDARD, NYLON WHEELS C/W 2 X HANDLES

    SKATE BASKET, STANDARD, NYLON WHEELS C/W 2 X HANDLES

    • Minimum Space Required in Vehicle
    • Support Arm Works as Stabiliser during Loading and Unloading
    • Reduce potential injury and fatigue to operator
    • Doesn't have any influence on axel counters, even when they are not correctly adjusted (set over height)
    • Safe and efficient method of transporting tools and smaller plant equipment to worksite
    • Width - 360mm
    • Length - 870mm
    • Height - 190mm (without push handles fitted)
    • Height - 820mm (with push handles fitted)
    • Weight - 13.6kg (without push handles fitted)
    • Weight - 17.8kg (with push handles fitted) 
    • Safe Working Load - (NWR Spec) 250kg
    • Safe Working Load - (LU Spec) 75kg
    • BS EN 13977:2011 - Railway application - Track - Safety requirements for portable machines and Skate Baskets for construction and maintenance.
    • RIS 1701 PLT - Rail Industry Standard for Portable and Transportable Plant Used for Infrastructure Work.
Relevance
Set Descending Direction

Grid List

10 per page

Items 11 to 20 of 114 total

  1. 1
  2. 2
  3. 3
  4. 4
  5. 5