Search results for 'mop handle blue'

Relevance
Set Descending Direction

Grid List

10 per page

Items 11 to 20 of 37 total

  1. 1
  2. 2
  3. 3
  4. 4
  1. PAN PULLER E PLUS, RED END FOR S & C, SUITS EP20127 CLIPS, SLEEPER TYPES F27, EF28, 5EF28 & NEW S&C DESIGNS TO NR56V PAN PULLER E PLUS, RED END FOR S & C, SUITS EP20127 CLIPS, SLEEPER TYPES F27, EF28, 5EF28 & NEW S&C DESIGNS TO NR56V

    PAN PULLER E PLUS, RED END FOR S & C, SUITS EP20127 CLIPS, SLEEPER TYPES F27, EF28, 5EF28 & NEW S&C DESIGNS TO NR56V

    £312.94
    Colour: Red working head (matches the appropriate e-PLUS clip type), and yellow handle. For use with eP20127 clips for retrofitting to sleeper types: F27, EF28, 5EF28, and for the new S&C designs to NR56V. All STEL hand-tools can be supplied with optional insulated handles, which have recently been upgraded to 32mm diameter cylindrical straight handles Installation Instructions • Insert center leg of clip into housing. • Place pivoted hook over the inside of the front arch of clip with foot of PANPULLER behind clip housing and ensure lip of the hook is under the front arch. • Taking up a natural stance with feet apart, move one leg half a pace back to prevent loss of balance. Stand behind the PANPULLER, with both hands on tee handle at top of PANPULLER, pull strongly towards chest until refusal. • The PANPULLER automatically pulls clip to the correct position When correctly installed the centre leg of ALL types of e-PLUS clips, protrude beyond the shoulder to hold the side-insulator in the correct position. This tool is 'handed' to hold the insulator in position during clip insertion. This means that the tool cannot be used for extraction of the clip. To extract this e-Plus clip use a standard PANPULLER Type LP1180
  2. PANDROL TYPE INSTALLER FASTCLIP FC-FE & VIPA OVER THE RAIL TOOL INSTALLER FASTCLIP FC-FE & VIPA OVER THE RAIL TOOL

    PANDROL TYPE INSTALLER FASTCLIP FC-FE & VIPA OVER THE RAIL TOOL

    £372.50
    Suitable for use on FASTCLIP FC, FASTCLIP FE, VIPA-SP and SFC fastenings. The new tools, which react from the rail, are more efficient, faster and safer because they are not prone to slipping from the shoulder reaction points. Additionally, the tools offer compatibility with a wide range of Pandrol systems, including FASTCLIP ‘FC’ & FASTCLIP ‘FE’ and the Pandrol VIPA-SP & SFC baseplates. Finally, because the reaction point for the installation tool has been moved to the head of the rail, the installer is able to lift sleepers (about 20mm) as part of the normal action of the tool, lifting from the rear arches of the clip before driving the clip into the installed position. NOTE: This tool has options avaialble under separate reference numbers; for variants with either insulated handles and / or cranked heads for confined spaces. The standard tool is always supplied with a straight head and steel handle. Optional variant of this tool using cranked head for confined spaces and insulated handle To insert the clips from the ‘Parked’ position of the shoulder as delivered from the sleeper factory, follow these instructions. The paddle should be in the normal front pivot hole and the side cheeks in the down position. (Different from the photograph) for ALL rail sizes. Locate the hooks on the side arms over the head of the rail. To insert the clips, grasp both handles of the ‘Tee’ bar, and stand ‘naturally’ with feet apart then move one leg half a pace back, to prevent loss of balance during clip driving. Pull on the handle until refusal. The fully driven position for FASTCLIP ‘FC’ is achieved when the outer legs of the clip touch the rear of the side insulator in the shoulder, or with up to 3 mm of clearance. The FASTCLIP ‘FE’ installed position does NOT touch the shoulder or insulator. Once located the tool can be slid along the rail between sleepers for the next clip insertion. If the clip needs to be re-inserted from fully extracted, move the cheeks to the up position, to extend the reach of the tool. If more reach is required, the paddle can be moved to the rear pivot hole. Follow the instructions above.
  3. SHOVEL, RABBIT / POST HOLE  INSULATED SHOVEL, RABBIT / POST HOLE  INSULATED

    SHOVEL, RABBIT / POST HOLE INSULATED

    £68.06
    SHOVEL, RABBIT / POST HOLE INSULATED HEAD SIZE 5-1/2" X 12" LONG 54" HANDLE, OVERALL LENGTH 72"
  4. SUMO, BUILDERS / FENCING INSULATED SPADE SUMO, BUILDERS / FENCING INSULATED SPADE

    SUMO, BUILDERS / FENCING INSULATED SPADE

    £77.92
    SUMO, BUILDERS / FENCING INSULATED SPADE 54" LONG HANDLE, OVERALL LENGTH 72" HEAD SIZE 5-1/2" X 14" LONG
  5. PANDROL TYPE EXTRACTOR FASTCLIP FE / FC & VIPA-SP, SFC ALL CREAM COLOUR 0039/047851 PANDROL TYPE EXTRACTOR FASTCLIP FE / FC & VIPA-SP, SFC ALL CREAM COLOUR 0039/047851

    PANDROL TYPE EXTRACTOR FASTCLIP FE / FC & VIPA-SP, SFC ALL CREAM COLOUR 0039/047851

    £187.50
    Product Code: 0039/047851 Previously LP18679 Suitable for extracting FASTCLIP FC, FASTCLIP FE, VIPA-SP and SFC fastenings. The new tools, which react from the rail, are more efficient, faster and safer because they are not prone to slipping from the shoulder reaction points. Additionally, the tools offer compatibility with a wide range of Pandrol systems, including FASTCLIP ‘FC’ & FASTCLIP ‘FE’ and the Pandrol baseplate types VIPA-SP & SFC baseplate. Instructions for Extractor AE17385 The Extractor tool acts as a lever against the web of the rail and the toe of the clip. To locate the tool hold at angle away from the rail and move forwards to position the tool between the rail and the shoulder, with the rear clip catching frame towards the operators foot. Once located grasp both handles of the ‘Tee’ bar, and stand ‘naturally’ with feet apart then move one leg half a pace back, to prevent loss of balance during clip extraction. Push the handles away until the rear of the clip touches the catching frame, to ensure the clip remains in the shoulder, to locate in the ‘Parked’ position. Care should be taken to maintain the operator’s balance during clip extraction as the handle is pushed away. To remove the clip completely from the shoulder, keep pushing the handle so the frame hinges upwards and the clip is removed from the shoulder.
  6. PANDROL TYPE PAN PULLER, E CLIP,TYPE D FOR PR & E CLIPS PANDROL TYPE PAN PULLER, E CLIP,TYPE D FOR PR & E CLIPS

    PANDROL TYPE PAN PULLER, E CLIP,TYPE D FOR PR & E CLIPS

    £136.25
    PANDROL No. LP7632 Especially for e2001 and e2007clips but NOT for 4-shoulder baseplates. NOTE hook positions for max efficiency: Upper pivot: Clip installation Lower pivot: Clip extraction All Pandrol hand-tools can be supplied with optional insulated handles, which have recently been upgraded to 35mm diameter cylindrical handles with ‘T’ cross bars for improved ergonomic and safer use. Installation Instructions ​• Insert center leg of clip into housing. • Place pivoted hook over the inside of the front arch of clip with foot of PANPULLER behind clip housing and ensure lip of the hook is under the front arch. • Taking up a natural stance with feet apart, move one leg half a pace back to prevent loss of balance. Stand behind the PANPULLER, with both hands on tee handle at top of PANPULLER, pull strongly towards chest until refusal. • The PANPULLER automatically pulls clip to the correct position Extraction Instructions Reverse the PANPULLER
  7. PANDROL TYPE PAN SETTER, STEL, ALL BLUE SUITABLE FOR ALL NWR SLEEPERS FITTED WITH PR, E & E PLUS PR, E, E-Plus & RE Clips Pan Setter

    PANDROL TYPE PAN SETTER, STEL, ALL BLUE SUITABLE FOR ALL NWR SLEEPERS FITTED WITH PR, E & E PLUS

    £137.50
    Cat No; Reference: 0039/42900 The PANSETTER is suitable for all Network Rail Sleepers fitted with PR, e & e-PLUS. Used for lifting the sleeper to the rail foot. It pushes the rail over, leaving the correct gap between the rail foot and the Pandrol housing, so that the insulator can be easily placed in the correct position. All Pandrol hand-tools can be supplied with optional insulated handles, which have recently been upgraded to 35mm diameter cylindrical handles with ‘T’ cross bars for improved ergonomic and safer use.
  8. LINK TROLLEY, STEL, LUL SPECIFICATION, INSULATED WHEELS & ALUMINIUM DECK COMPLETE WITH BRAKE HANDLE, PUSH BAR & REDLEDS LINK TROLLEY, STEL, LUL SPECIFICATION, INSULATED WHEELS & ALUMINIUM DECK COMPLETE WITH BRAKE HANDLE, PUSH BAR & REDLEDS

    LINK TROLLEY, STEL, LUL SPECIFICATION, INSULATED WHEELS & ALUMINIUM DECK COMPLETE WITH BRAKE HANDLE, PUSH BAR & REDLEDS

    PLEASE CALL FOR PRICE, AVAILABILITY AND LEAD TIME - 0114 383 0110

    Designed to be used as a manual propelled, stand-alone load-bearing rolling platform for use on the rail track. Each Link Trolley is equipped with a fail safe braking system and is supplied with detachable Brake and Push Handles. Up to three Link Trolleys can be connected together.

  9. LINK TROLLEY, STEL, NETWORK RAIL SPECIFICATION, NON INSULATED WHEELS & WOODEN DECK COMPLETE WITH BRAKE HANDLE, PUSH BAR & REDLEDS LINK TROLLEY, STEL, NETWORK RAIL SPECIFICATION, NON INSULATED WHEELS & WOODEN DECK COMPLETE WITH BRAKE HANDLE, PUSH BAR & REDLEDS

    LINK TROLLEY, STEL, NETWORK RAIL SPECIFICATION, NON INSULATED WHEELS & WOODEN DECK COMPLETE WITH BRAKE HANDLE, PUSH BAR & REDLEDS

    The Link Trolley supplied by STEL is used on the Network Rail (NWR) and London Underground (LUL) infrastructure. The Link Trolley is used for carrying heavy loads of tools and equipment accross the rail tracks to accomodate track maintenance operations.

    PLEASE CALL FOR PRICE, AVAILABILITY AND LEAD TIME - 0114 383 0110

  10. SPLIT / B TYPE TROLLEY, INSULATED STEL, LUL / TFL SPECIFICATION, COMPLETE WITH BRAKE HANDLE & PUSH BAR, 2 X REDLED Split Trolley LU Specific - B Type

    SPLIT / B TYPE TROLLEY, INSULATED STEL, LUL / TFL SPECIFICATION, COMPLETE WITH BRAKE HANDLE & PUSH BAR, 2 X REDLED

    PLEASE CALL FOR PRICE, AVAILABILITY AND LEAD TIME - 0114 383 0110

    Designed to be used as a manual propelled, stand-alone load-bearing rolling platform for use on the rail track. Each trolley is equipped with a fail safe braking system and is supplied with detachable Brake and Push Handles. The Split Trolley has been designed to be split into two halves to aid with manual handling and transporting to and from site.

Relevance
Set Descending Direction

Grid List

10 per page

Items 11 to 20 of 37 total

  1. 1
  2. 2
  3. 3
  4. 4