Search results for 'milwaukee 4932472122 comp'
Maximum Search query length is 25. Your query was cut.
-
Rail Handler (Ironman) LU Specific
Designed to be used singularly or in pairs, for the lifting and transportation of lengths or rail, or parts of points and crossings from one location to another. The Ironman can also be used to transpose rail from one side of the track to the other. Therefore by straddling the running rails, access to the four-foot, six-foot and cess is possible.- Out of stock
- Add to Wishlist
- | Add to Compare
-
SPLIT / B TYPE TROLLEY, NON INSULATED STEL, NETWORK RAIL SPECIFICATION, COMPLETE WITH BRAKE HANDLE & PUSH BAR, 2 X REDLED
Designed to be used as a manual propelled, stand-alone load-bearing rolling platform for use on the rail track. Each trolley is equipped with a fail safe braking system and is supplied with detachable Brake and Push Handles. The Split Trolley has been designed to be split into two halves to aid with manual handling and transporting to and from site.- Out of stock
- Add to Wishlist
- | Add to Compare
-
SPLIT / B TYPE TROLLEY, INSULATED STEL, LUL / TFL SPECIFICATION, COMPLETE WITH BRAKE HANDLE & PUSH BAR, 2 X REDLED
PLEASE CALL FOR PRICE, AVAILABILITY AND LEAD TIME - 0114 383 0110
Designed to be used as a manual propelled, stand-alone load-bearing rolling platform for use on the rail track. Each trolley is equipped with a fail safe braking system and is supplied with detachable Brake and Push Handles. The Split Trolley has been designed to be split into two halves to aid with manual handling and transporting to and from site.
-
LINK TROLLEY, STEL, NETWORK RAIL SPECIFICATION, NON INSULATED WHEELS & WOODEN DECK COMPLETE WITH BRAKE HANDLE, PUSH BAR & REDLEDS
The Link Trolley supplied by STEL is used on the Network Rail (NWR) and London Underground (LUL) infrastructure. The Link Trolley is used for carrying heavy loads of tools and equipment accross the rail tracks to accomodate track maintenance operations.
PLEASE CALL FOR PRICE, AVAILABILITY AND LEAD TIME - 0114 383 0110
-
LINK TROLLEY, STEL, LUL SPECIFICATION, INSULATED WHEELS & ALUMINIUM DECK COMPLETE WITH BRAKE HANDLE, PUSH BAR & REDLEDS
PLEASE CALL FOR PRICE, AVAILABILITY AND LEAD TIME - 0114 383 0110
Designed to be used as a manual propelled, stand-alone load-bearing rolling platform for use on the rail track. Each Link Trolley is equipped with a fail safe braking system and is supplied with detachable Brake and Push Handles. Up to three Link Trolleys can be connected together.
-
9 Prong Ballast Fork
£52.95Similar in design to the nine prong compost fork but more suited to heavy-duty work, the ballast fork is ideal for: Moving and loading stone, ballast and tarmac. Use by railway workers to transfer roadbed ballast. -
Spring/Compression Spring Assortment (200pc)
£8.95Assorted Springs and Compression Springs, Supplied in partitioned case
Quantity: 200- Out of stock
- Add to Wishlist
- | Add to Compare
-
14 Metre 110V Extension Lead (2.5mm 32amp)
Robust Thick 110V 32AMP 14M Yellow Extension Lead Complete with Socket and Plug, Ideal for Construction Sites
PRICE ON APPLICATION
- Out of stock
- Add to Wishlist
- | Add to Compare
-
Insulation Tape 19mm x 20m (Black)
£0.99 As low as: £0.90Insulation Tape 19mm x 20m (Black)
Professional grade PVC electrical insulation tape
BS EN 60454
RoHS Compliant
-
Insulation Tape 25mm x 33m (Yellow)
£2.95Insulation Tape 25mm x 33m (Yellow)
Professional grade PVC electrical insulation tape
BS EN 60454
RoHS Compliant
Durable 15 thou’ material
Flame retardant